Sourlands TM Date 20091212
From JORBA
Contents |
[edit] Park
[edit] Date/Time
- December 12, 2009, 9:00 am (weather permitting)
[edit] Meeting Place
- East mountain Road (see map below)
[edit] Distance to Work
- You can either hike or bike to the work site. The fastest route is straight up the gas pipeline, then bear left into the singletrack at Post #5. The hike will take approximately 20 minutes.
[edit] Work Being Done
- We are planning to elevate/armor the section of trail immediately after the really long boardwalk between Posts 5&6. This is part of the white square trail.
[edit] Google Map of Work Area
[edit] Pictures/Videos of Work Area
[edit] Before
[edit] During
[edit] After
[edit] Sponsor
- JORBA tools supplied
[edit] Food Available
- TBD
[edit] Tools & Items Needed
- No tools needed
- Bring some gloves if you have them.
- Wear some boots or sneakers you really don't care about.
- Bring your own drink
[edit] Expected Volunteers
[edit] Pre/Post Ride
- Before: MannyBManny will lead a pre-TM ride at 7:00 am (no really who's kidding? It will be 7:20). Call it 90-ish minutes reasonable effort to get the overall feel of the park.
- After: No current plans
[edit] Discussion/Info
- MTBNJ Forum post - the announcement
- Somerset County Parks flyer
- Additional info

